RiskNIS Package "A"
NIS

Risk management and use of risk-based approaches in inspection, maintenance and HSE analyses of NIS a.d. plants

Duration: 42 Months
Partners: 5
Budget: 2.3 M€
Status: Package A finished (2008)

Under the contract between Petroleum Industry of Serbia (NIS a.d.) and Stenbeis Advanced Risk Technologies in the first package of the project, the comprehensive critical review of the state of NIS assets (Basic Resource Document) has been made and the integrated web-based system for Risk-based inspection (RBI), Reliability Centered Maintenance (RCM), Root Cause Failure Analysis (RCFA) and Health, Safety and Environment analysis installed and applied on over 2000 sample cases.

http://www.risknis.risk-technologies.com